ECONOMY


90 per cent of TAP route cleared in Greece, Albania

90 per cent of TAP route cleared in Greece, Albania

Baku, January 18, AZERTAC

Around 90 percent of the Trans Adriatic Pipeline (TAP) route has been cleared in Greece and Albania.

TAP is a part of the Southern Gas Corridor, which is one of the priority energy projects for the European Union. The project envisages transportation of gas from Azerbaijan's Shah Deniz Stage 2 to the EU countries.

The pipeline will connect to the Trans Anatolian Natural Gas Pipeline (TANAP) on the Turkish-Greek border, run through Greece, Albania and the Adriatic Sea, before coming ashore in Italy’s south.

TAP will be 878 kilometers in length (Greece 550 kilometers, Albania 215 kilometers, Adriatic Sea 105 kilometers, and Italy 8 kilometers).

TAP’s shareholding is comprised of BP (20 percent), SOCAR (20 percent), Snam S.p.A. (20 percent), Fluxys (19 percent), Enagás (16 percent) and Axpo (5 percent).

© Content from this site must be hyperlinked when used.
Report a mistake by marking it and pressing ctrl + enter

FEEDBACK

Fields with * are required.

Please enter the letters as they are shown in the image above.
Letters are not case-sensitive.