ECONOMY


BRIDGE RECONSTRUCTED

Floods caused by the spring rains destroyed one of the three bridges across the Aji River in Pirhasanli village of Agsu region of Azerbaijan; it has already been reconstructed, however, with the assistance of regional executive power and the village municipality.

The new bridge has been built on the base of village inhabitant, engineer Mubariz Badalov’s project. Its height is 6.5 meters, length is 20, and width is 3 meters. Iron-concrete panels were used as a building material.

© Content from this site must be hyperlinked when used.
Report a mistake by marking it and pressing ctrl + enter

FEEDBACK

Fields with * are required.

Please enter the letters as they are shown in the image above.
Letters are not case-sensitive.