ECONOMY


DRILLING WORKS UNDERWAY

Drilling works are in success at the “Chirag” and “Azeri” platforms.Senior specialist of the “bp-Azerbaijan” Company on drilling Rauf Malikbayov informed AzerTAj correspondent that another operational well had been drilled at the “Chirag” platform. This is the 18th of 24 planned. Drilling of the well on “Western Azeri” platform is to be completed soon. Preliminary depth of the well is 1011 meters.

© Content from this site must be hyperlinked when used.
Report a mistake by marking it and pressing ctrl + enter

FEEDBACK

Fields with * are required.

Please enter the letters as they are shown in the image above.
Letters are not case-sensitive.