New wells drilled by Absheron Drilling Works Office
AzerTAg.az
13.04.2011 [21:03]
Baku, April 13 (AZERTAC). Absheron Drilling Works Office of Complex Drilling Works Trust has started drilling the well # 1077 on Pirallahy field. The projected depth of the well drilled to Girmaki Suite by Absheronneft OGDP is 770 m. Besides, drilling of the well # 4022 has started in onshore Balakhany. The projected depth of the well drilled to Girmaki Suite by Balakhanyneft OGDP is 980 meters. According to geologists, the expected output will be 4 tons of oil daily.
© Content from this site must be hyperlinked when used.
Report a mistake by marking it and pressing ctrl + enter
Other news in this section
31.01.2023 [10:57]
31.01.2023 [10:56]
30.01.2023 [15:28]
30.01.2023 [14:03]
MULTIMEDIA
31.01.2023 [11:23]
31.01.2023 [11:40]
31.01.2023 [11:12]
31.01.2023 [10:53]
31.01.2023 [10:56]
30.01.2023 [22:37]
30.01.2023 [22:32]
30.01.2023 [15:27]
27.01.2023 [17:55]
26.01.2023 [17:42]
27.01.2023 [20:47]
27.01.2023 [16:51]
26.01.2023 [14:07]
26.01.2023 [10:55]
21.01.2023 [15:13]
18.01.2023 [22:23]
17.01.2023 [17:22]
26.01.2023 [18:03]
25.01.2023 [13:56]
24.01.2023 [18:35]
16.01.2023 [17:36]
14.01.2023 [15:39]
30.01.2023 [15:16]
30.01.2023 [13:56]
27.01.2023 [19:14]
Text contains orthographic mistake