ECONOMY


New wells drilled by Absheron Drilling Works Office

Baku, April 13 (AZERTAC). Absheron Drilling Works Office of Complex Drilling Works Trust has started drilling the well # 1077 on Pirallahy field. The projected depth of the well drilled to Girmaki Suite by Absheronneft OGDP is 770 m. Besides, drilling of the well # 4022 has started in onshore Balakhany. The projected depth of the well drilled to Girmaki Suite by Balakhanyneft OGDP is 980 meters. According to geologists, the expected output will be 4 tons of oil daily.

© Content from this site must be hyperlinked when used.
Report a mistake by marking it and pressing ctrl + enter

FEEDBACK

Fields with * are required.

Please enter the letters as they are shown in the image above.
Letters are not case-sensitive.