PROBLEM OF DRINKING WATER SOLVED IN ZAGATALA
AzerTAg.az
29.07.2003 [12:22]
The problem of lack of drinking water is totally solved in the Zagatala city of Azerbaijan by constructing the second main line of water pipe with length of 7 kilometers in this city.
As AzerTAj correspondent was informed in the executive power, two reservoirs with capacity of 200 m3 were installed, and water reservoir with capacity of 2000 m3 is thoroughly repaired. New water pipeline, with the length of 2 kilometers, was constructed in the new housing block of the regional center.
© Content from this site must be hyperlinked when used.
Report a mistake by marking it and pressing ctrl + enter
Other news in this section
01.06.2021 [17:29]
04.02.2021 [14:37]
08.01.2021 [13:37]
25.09.2020 [16:28]
MULTIMEDIA
28.03.2023 [10:38]
28.03.2023 [17:48]
28.03.2023 [17:24]
28.03.2023 [17:18]
28.03.2023 [16:42]
28.03.2023 [15:56]
28.03.2023 [12:22]
28.03.2023 [15:40]
28.03.2023 [12:47]
28.03.2023 [11:30]
27.03.2023 [20:54]
27.03.2023 [19:49]
18.03.2023 [19:13]
17.03.2023 [10:43]
23.02.2023 [20:10]
10.02.2023 [16:33]
28.03.2023 [13:24]
27.03.2023 [17:24]
27.03.2023 [17:21]
25.03.2023 [19:17]
24.03.2023 [23:01]
15.03.2023 [17:02]
27.03.2023 [17:20]
27.03.2023 [11:31]
25.03.2023 [20:26]
Text contains orthographic mistake