ECONOMY


DRILLING PROGRAM CONTINUING AT CENTRAL AZERI PLATFORM

BP Azerbaijan said it completed the second platform-drilled well (which was a producer) at the end of July and is currently drilling the third well, which will reach total depth by mid-November.

The company plans to drill two more wells from the Central Azeri platform this year, which will be production wells.

© Content from this site must be hyperlinked when used.
Report a mistake by marking it and pressing ctrl + enter

FEEDBACK

Fields with * are required.

Please enter the letters as they are shown in the image above.
Letters are not case-sensitive.