CONSTRUCTION OF TINNED FOOD FACTORY LAUNCHES IN SHAKI
AzerTAg.az
16.07.2003 [11:10]
Construction of the tinned food factory with annual productive capacity of 16 million tins was started in Shaki region. Financial assets for construction of this factory were allocated by ‘Mostbank’, AzerTAj correspondent was told at the executive power of the region.
© Content from this site must be hyperlinked when used.
Report a mistake by marking it and pressing ctrl + enter
Other news in this section
18.03.2023 [11:29]
17.03.2023 [21:25]
17.03.2023 [15:48]
MULTIMEDIA
20.03.2023 [22:59]
20.03.2023 [16:09]
20.03.2023 [10:22]
18.03.2023 [19:13]
18.03.2023 [15:47]
18.03.2023 [13:47]
18.03.2023 [12:02]
17.03.2023 [13:37]
16.03.2023 [16:48]
17.03.2023 [18:26]
17.03.2023 [17:35]
16.03.2023 [19:22]
18.03.2023 [19:13]
17.03.2023 [10:43]
23.02.2023 [20:10]
10.02.2023 [16:33]
19.03.2023 [19:30]
19.03.2023 [19:16]
17.03.2023 [16:32]
09.03.2023 [16:39]
06.03.2023 [12:51]
03.03.2023 [17:15]
16.03.2023 [14:30]
Text contains orthographic mistake