TRAINING FOR LOCAL COMPANIES

02.07.2003 [14:41]
A day or two ago the Enterprise Center, together with BP’s HSE Department, organized an HSE Training Course for local ...

GEORGIAN PLOT OF BTC MEP CONSTRUCTION EXPANDING

02.07.2003 [12:36]
Chief executive director of the ‘BTC Co’ Company, constructing the Georgian plot of BTC MEP, Mr. Michael Townsend spoke of ...

BTE PROJECT’S EQUIPMENT BEING PREPARED

02.07.2003 [12:34]
Currently, in Singapore and Malaysia are prepared equipment for the Baku-Tbilisi-Erzurum gas pipeline project, evaluated at $3 billion, executive director ...

AKER KVAERNER WINS CONTRACT IN CASPIAN

01.07.2003 [23:03]
According to the press-release of Aker Kvaerner, its subsidiary, Kvaerner Process Systems (KPS), has been awarded a contract by ...

Azerbaijani Oil Fund Assets At $810 Million July 1

01.07.2003 [22:13]
The Azerbaijani state oil fund said Tuesday that it has accumulated $809.9 million in receipts from oil sales. "We had ...

POLISH PLANT TO REFINE CASPIAN OIL

01.07.2003 [19:28]
The Polish ‘Lotos’, the owner of petroleum-refining plant in Gdansk has signed an intention protocol with Public Corporation ‘Ukrtransneft’ ...

MACHINE-BUILDING ENTERPRISES TO HAVE INTERNATIONAL STANDARDS

01.07.2003 [18:09]
Six enterprises of the ‘Azerneftkimyamash’ OSC are conducting expedient measures to receive certificates on production that meet international standards. ...

TURKEY TO LAY GARS-TBILISI RAILWAY

01.07.2003 [16:12]
Turkish engineers have completed working on the preliminary project on the Gars-Tbilisi railway that will provide for the passenger and ...

EQUIPMENT FOR BAKU-TBILISI-ERZURUM PROJECT PREPARED

01.07.2003 [13:49]
Equipment for Baku-Tbilisi-Erzurum project estimated in $3 billion is currently being prepared in Singapore and Malaysia, BTC executive director ...